63°F

Font Size

Questions (Ask Bev)

Video on Demand

Jobs

iMap (GIS)

eNotice

Water Tracker
Search Documents
Search
Urban Water Management Plan 2010
describes the City's current conservation activities, as well as those efforts that will be utilized in the event of a water supply interruption, such as drought. The City's water shortage contingency plan was developed in consultation and coordination
http://www.beverlyhills.org/cbhfiles/storage/files/filebank/9152--Urban Water Management Plan 2010_8-30-11.pdf
Live Scan Application
State of California Department of Justice REQUEST FOR LIVE SCAN SERVICE BCII 8016 (3/07) Applicant Submission ORI: Type of Application: Agency Address Set Contributing Agency: Agency authorized to receive criminal history
http://www.beverlyhills.org/cbhfiles/storage/files/1818165197879352785/LiveScanApplication.pdf
Urban Water Management Plan 2005
City Manager Roderick J. Wood Director of Public Works David Gustavson Environmental Utilities Manager Shana E. Epstein CITY OF BEVERLY HILLS 2005 URBAN WATER MANAGEMENT PLAN CITY OF BEVERLY HILLS 2005 URBAN WATER MANAGEMENT
http://www.beverlyhills.org/cbhfiles/storage/files/filebank/3503--2005 Urban Water Management Plan.pdf
Residential & Commercial Notice - April 2010
Proposed Utility Rates
Utility Rates & Fees BHMC 6-1- REFERENCE T Y P E O F U T I L I T Y C H A R G E Inside Outside Inside Outside Inside Outside City City City City City City Water 88-R-7759 Service Connection Charge: General 1" and smaller 670.46 848.70
http://www.beverlyhills.org/cbhfiles/storage/files/120252671152874575/ProposedUtilityRates.pdf
Construction Notice Pilot Bicycle Route Project 6-10-2013
CONSTRUCTION NOTICE PILOT BICYCLE ROUTE PROJECT BURTON WAY AND NORTH CRESCENT DRIVE JUNE 24 - JULY 3, 2013 The City of Beverly Hills is pleased to announce the placement of our first bikeway pilot project! The City's contractor will begin
http://www.beverlyhills.org/cbhfiles/storage/files/5088037251746214503/ConstructionNoticeBikeLanes06-10-13.pdf
Construction Notice Bike Lanes 6-10-2013
CONSTRUCTION NOTICE PILOT BICYCLE ROUTE PROJECT BURTON WAY AND NORTH CRESCENT DRIVE JUNE 24 - JULY 3, 2013 The City of Beverly Hills is pleased to announce the placement of our first bikeway pilot project! The City's contractor will begin
http://www.beverlyhills.org/cbhfiles/storage/files/710356690205490554/ConstructionNoticeBikeLanes06-10-13.pdf
Call Me Cheap
Health Drink
Low Flow
Slow Flow
Bicycle Route Pilot Project 11-16-2011
of Potential Bicycle Facilities: Class III Bicycle Routes: ? Bicycle routes could be designated with signage and sharrow striping ? Traffic volumes appear to be low on Crescent Dr, south of Wilshire Bl ? Narrow street benefits cyclists
http://www.beverlyhills.org/cbhfiles/storage/files/filebank/9855--Routes Map 11-16-2011.pdf
Public Right-of-Way Approved Heavy Haul Routes
BLVD CIVIC C ENTER DR WILSHIRE BLVD N PA LM D R BURTON WY N OA KHU RST DR SUNSET BLVD N DO HEN Y DR SUNS ET BL VD Approved Heavy Haul Routes - City of Beverly Hills, California E Map produced by: City of Beverly Hills - Information Technology -
http://www.beverlyhills.org/cbhfiles/storage/files/filebank/4946--HeavyHaul_Routes.pdf
Agenda Report 3-2-10
Beverly Hills Utility Bills Now Payable Online!
Utility Bills Now Payable Online! Beverly Hills, CA - Beverly Hills utility customers now have the option to pay their City utility bills online. Customers can check their bills and make a credit card payment instantly from their home computers
http://www.beverlyhills.org/cbhfiles/storage/files/filebank/8650--UtilityBillOnlinePaymentsFINAL.pdf
Beverly Hills Asks for Public Input on Bike Route Pilot Program
for Public Input on Bike Route Pilot Program Meetings Will Be Held April 11, April 25 and May 9 Beverly Hills, CA - Get those wheels spinning! The public is encouraged to attend any of three meetings on a proposed pilot project to create up to five
http://www.beverlyhills.org/cbhfiles/storage/files/filebank/10481--BicycleMeetingsFINAL.pdf
Consumer Confidence Report 2008
ppm 4 4 Average 1.7 Drinking water disinfectant added for treatment (1) During a prolonged main break in September 2007, an affected area was supplied with LADWP water. From time to time, the City of Beverly Hills Water Utility
http://www.beverlyhills.org/cbhfiles/storage/files/filebank/5617--2008 Consumer Confidence Report.pdf
Holiday Permit Moratorium 2012
H O L I D A Y P E R M I T M O R A T O R I U M A R E A M A PN O V E M B E R 1 2 , 2 0 1 2 - J A N U A R Y 7 , 2 0 1 3 Sunset Bouleva rd North S anta Mo nica Bo ulevard WilshireBoulevard South Santa M onica B oulevar d Rexford DriveCharlev
http://www.beverlyhills.org/cbhfiles/storage/files/7103220221299953484/HolidayPermitMoratoriumMap2012.pdf
Public Works Commission Liaison Meeting Agenda 11-14-2011
B e v e r l y H i l l s C i t y C o u n c i l C o u n c i l / P u b l i c W o r k s C o m m i s s i o n L i a i s o nC o m m i t t e e w i l l c o n d u c t a S p e c i a l M e e t i n g , a t t h e f o l l o w i n g t i m e a n dp l a c e , a n d w
http://www.beverlyhills.org/cbhfiles/storage/files/filebank/9747--Public Works Commission Liaison Meeting Agenda 11-14-2011.PDF
Utility Rates and Fees FY 2012-13
Utility Rates and Fees REFERENCE Inside Outside City City 10-R-12775 Delinquent City Utility Bills Late Payment Charge 3% per month, or fraction thereof, of the unpaid portion 3.00% 3.00% of any bill on a commercial account. 1.5% per month,
http://www.beverlyhills.org/cbhfiles/storage/files/1635491025905596610/UtilityRatesandFeesFY2012-2013.pdf
Public Works Commission Liaison Meeting Agenda 3-27-2012
Floor Conference Room A Tuesday, March 27, 2012 7:00 AM, SPECIAL MEETING AGENDA a. Members of the public will be given directly address the Committee on any agenda. 2) Water Utility Revenue Requirements for the FY 2012/13 and 2013/14 3) Groundwater
http://www.beverlyhills.org/cbhfiles/storage/files/filebank/10441--Public Works Commission Liaison Meeting Agenda 3-27-2012.PDF
Audit Liaison Committee Meeting Agenda 1-17-2012
V T h e B e v e r l y H i l l s C i t y C o u n c i l A u d i t C o m m i t t e e w i l l c o n d u c t aS p e c i a l M e e t i n g , a t t h e f o l l o w i n g t i m e a n d p l a c e , a n d w i l l a d d r e s s t h e a g e n d a l i s t e d b e
http://www.beverlyhills.org/cbhfiles/storage/files/filebank/10029--Audit Liasion Committee Meeting Agenda 1-17-2012.PDF
Matrix Study of the Community Development Department
system is utilized to receive inspections with linkage to OBC. The City recently launched an internet based inspection request and tracking service for applicants. ? Combination inspectors are utilized to respond to inspection requests. ? The OBC permit
http://www.beverlyhills.org/cbhfiles/storage/files/filebank/4628--Beverly Hills CDD Final Draft Report.pdf
City of Beverly Hills Issues Resolution on Purple Line Extension
School campus and opposes constraints, including the currently proposed route of the Westside Subway Extension, which might prevent the full utilization of the City's only High School campus by future generations of students. Office of Communications
http://www.beverlyhills.org/cbhfiles/storage/files/8071231761255395317/SubwayReso4-11-13FINAL.pdf
Commercial Accessibility Plan Review Checklist
parallel to the vehicle roadway) to the maximum extent allowed by legal or site constraints. Bus stop pads shall connect to streets, sidewalks or pedestrian paths as part of an accessible route. Newly constructed bus stop pads must provide a square curb
http://www.beverlyhills.org/cbhfiles/storage/files/filebank/5164--2008 BH Plan Review List - Commercial Accessibility v1.pdf
1   2   3   4   5   ... 20   >>