69°F

Font Size

Questions (Ask Bev)

Video on Demand

Jobs

iMap (GIS)

eNotice

Water Tracker

Org Chart

Advocate Registration
Search Website
Search
Prequalification Package

to the hearing, the Contractor shall, in writing, be advised of the basis for the City’s prequalification determination. The hearing shall be conducted by a panel consisting of three members of the Department of Public Works & Transportation senior
http://www.beverlyhills.org/cbhfiles/storage/files/1221630725276189321/SM5SignagePrequalPackage.pdf
PREQUALIFICATION PACKAGE FOR THE CONSTRUCTION OF FOUR CITY GATEWAY MONUMENTS

4 The hearing shall be conducted by a panel consisting of three members of the Department of Public Works & Transportation senior management staff (the “Appeals Panel”). The Appeals Panel shall consider any evidence presented by the Contractor, whether
http://www.beverlyhills.org/cbhfiles/storage/files/filebank/10065--GATEWAYPrequal Published_Project #12-20 1-19-2012.pdf
Prequalification Package

Inviting Bids for this Project. Prior to the hearing, the Contractor shall, in writing, be advised of the basis for the City’s pre-qualification determination. The hearing shall be conducted by a panel consisting of three members of the Department
http://www.beverlyhills.org/cbhfiles/storage/files/17115215111494849639/Prequalificationpackage.pdf
RFP Document

on request. The City’s taxicab rules and regulations are administered and enforced by a group within the Parking Services Division of the Department of Public Works & Transportation under the overall direction of the Director of Parking Operations.
http://www.beverlyhills.org/cbhfiles/storage/files/1967224105935247127/BHTaxicabFranchiseRFP52814.pdf
December 2013

FLOOR-NEIMAN MARCUS TI FOR PRADA; REMODEL OF INTERIOR SPACE INSIDE DEPARTMENT STORE. PARTIAL REMOVAL OF EXISTING PARTITION WALLS AND MILLWORK, FINISHES AND LIGHTING. INSTALL NEW PARTION WALLS, MILLWORK AND FINISHES MARCO CICCONE/ PRADA US CORP (212) 307-9300
http://www.beverlyhills.org/cbhfiles/storage/files/11674286991610505097/December2013.pdf
IFB C1056 Appendix C (Amd 3) - COBH Tech Spec for DI Pipe

W E S T S I D E S U B W A Y E X T E N S I O N P R O J E C T THIS PAGE INTENTIONALLY LEFT BLANK SPECIFICATIONS and STANDARD CONTRACTUAL REQUIREMENTS Construction of WATER MAIN RELOCATIONS –S Within the City of BEVERLY HILLS, CALIFORNIA PUBLIC WORKS DEPARTMENT BEVERLY HILLS,
http://www.beverlyhills.org/cbhfiles/storage/files/485089981442284360/C1056-LaCienega-AppendixC(Amd3)-COBHTechSpecforDIPipe.pdf
Sample Agreement

etc. CONTRACTOR shall comply with the provisions of Sections 1770-1777.5 of the California Labor Code, and Section 7-2 of the Standard Specifications, entitled “Labor.” The California Department of Industrial Relations has ascertained the general
http://www.beverlyhills.org/cbhfiles/storage/files/1241907760639921201/SmapleAgreement.pdf
Bid Package

for vehicle(s) covered by this bid from the California Department of Motor Vehicles in the name of the City of Beverly Hills, 455 North Rexford Drive, Beverly Hills, California 90210, before the vehicles(s) are delivered. 2. Delivery is an important
http://www.beverlyhills.org/cbhfiles/storage/files/6197933521157825952/BidPackage.pdf
4-17-13 AC Minutes

SPECIFIC CONDITIONS: 1. The two light fixtures shaii provide a minimum clearance of 8’4” from the bottom most portion of the light fixtures to the sidewalk in order to comply with clearance requirements set forth by the Department of Public Works.
http://www.beverlyhills.org/cbhfiles/storage/files/179572673803424253/4-17-13MinutesSIGNED.pdf
Draft 2014-2021 Housing Element Appendix D

permitting, the Community Development Department was restructured to form a dedicated group of zoning code and building experts focused on processing permits. The City is currently updating its zoning code to reduce inefficiencies and uncertainty
http://www.beverlyhills.org/cbhfiles/storage/files/19425091561586799900/2014-2021HEAppendixDReviewofPastAccomplishmentsHCDclean.pdf
<<   1 ...   141   142   143   144   145   ... 150   >>