65°F

Font Size

Questions (Ask Bev)

Video on Demand

Jobs

iMap (GIS)

eNotice

Water Tracker

Org Chart

Advocate Registration
Search Website
Search
Appendix B- Rules and Regulations

basis: a) In no event shall any franchisee, in any format or media, advertise or list a telephone number serving said operator which purports to be or is used as a telephone number of another taxicab company, real or fictitious, or other
http://www.beverlyhills.org/cbhfiles/storage/files/460074149912108665/BHRFPRulesRegulations52814Draft.pdf
Main Document

be cause for termination for default, and shall be cause for forfeiture of this bidder's bid security, if applicable. (e) In the event Contractor does not maintain current, valid evidence of insurance on file with City, City may, at its option,
http://www.beverlyhills.org/cbhfiles/storage/files/77597356874161729/B13-01-main.pdf
Specifications- Irrigation

of Landscape Architect. In the event this notification is not performed, Contractor shall assume full responsibility for any revision necessary. E. Reference Specifications and Standards. 1. ASTM: D1784 Rigid Polyvinyl Chloride (PVC) Compounds
http://www.beverlyhills.org/cbhfiles/storage/files/9969727391891359900/328400-Irrigation.pdf
Addendum No. 1

considered in engineering. Such obstructions or differences should be brought to the attention of Landscape Architect. In the event this notification is not performed, Contractor shall assume full responsibility for any revision necessary. E.
http://www.beverlyhills.org/cbhfiles/storage/files/5326832911327907882/AddendumNo1.pdf
Bid Document

to the City. (d) Failure to submit any required evidences of insurance within the required time period shall be cause for termination for default, and shall be cause for forfeiture of this bidder's bid security, if applicable. (e) In the event
http://www.beverlyhills.org/cbhfiles/storage/files/1053661572943842014/VoiceDataCabling(Bid05-34).pdf
Beverly Hills City Hall Historic Assessment Report

with important events in the main currents of national, state, or local history, or directly exemplifies or manifests significant contributions to the broad social, political, cultural, economic, recreational, or architectural history of the Nation, State, City,
http://www.beverlyhills.org/cbhfiles/storage/files/820304402421954432/BeverlyHillsCityHall.pdf
Urban Water Management Plan 2005

current conservation activities, as well as those efforts that will be utilized in the event of a water supply interruption, such as drought. The City’s water shortage contingency plan was developed in consultation and coordination with other MWD
http://www.beverlyhills.org/cbhfiles/storage/files/filebank/3503--2005 Urban Water Management Plan.pdf
Tab 11 - FPPC Campaign Disclosure Manual 2 (Revised 2007)

the contribution is recorded in campaign records. Assistant Treasurer An assistant treasurer may be designated on the Statement of Organization (Form 410) in the event that the treasurer is unavailable to sign a report when it is due. The assistant
http://www.beverlyhills.org/cbhfiles/storage/files/1472945679653097324/Tab11b-CampaignDisclosureManual2.pdf
FY 2010-11 CIP Budget

09Q4 10Q1 10Q2 10Q3 10Q4 11Q1 ---- ------------ ------------ ------------ ------------ ------------ -------- Design 07/01/10 07/31/10 Build 08/01/10 06/15/11 Deveop Intranet Apps 08/02/10 06/14/11 Expand GIS Apps 08/02/10 06/14/11
http://www.beverlyhills.org/cbhfiles/storage/files/filebank/7716--FY 2010-11 CIP BUDGET BOOK Vol 2 - FINAL 2.pdf
2009-10 4th Quarter Budget Status Report Vol 2

PROJECT SCHEDULE Milestones and Tasks Start Finish 10Q1 10Q2 10Q3 10Q4 11Q1 11Q2 ---- ------------ ------------ ------------ ------------ ------------ -------- Design 07/01/10 07/31/10 Build 08/01/10 06/15/11 Deveop Intranet Apps 08/02/10
http://www.beverlyhills.org/cbhfiles/storage/files/filebank/7617--FY 09-10 4th Quarter Budget Status Report Vol 2.pdf
<<   1 ...   107   108   109   110   111   ... 121   >>