65°F

Font Size

Questions (Ask Bev)

Video on Demand

Jobs

iMap (GIS)

eNotice

Water Tracker

Org Chart

Advocate Registration
Search Website
Search
Specifications- Irrigation

water lines. b. Connection to existing electrical power. c. Gate valves. d. Routing of sprinkler pressure lines (dimension max. 100 feet along routing and at each change of direction). e. Electric control valves. f. Routing of control wiring.
http://www.beverlyhills.org/cbhfiles/storage/files/9969727391891359900/328400-Irrigation.pdf
Addendum No. 1

points of reference, such as building corners, sidewalk edges, road intersections, etc., the location of the following items: a. Connection to existing water lines. b. Connection to existing electrical power. c. Gate valves. d. Routing
http://www.beverlyhills.org/cbhfiles/storage/files/5326832911327907882/AddendumNo1.pdf
April 2014

Building 4/15/2014 $9,450,640 New 30-unit, 2-bldg, 4-story MFR Condominium 309 ELM DR, S $1,725,754.84 $1, 724,754.84$1,000.00 BS1311036 Building 4/21/2014 $10,000 REMODEL CABANA 1130 HILLCREST RD $1,917.66 $1,917.66 $0.00 BS1318838 Building 4/2/2014
http://www.beverlyhills.org/cbhfiles/storage/files/1455148821307619081/April2014.pdf
Historic Resources Survey Report (2004)

Wilshire, near Canon Drive and Walden, and along Palm Drive just north of Santa Monica Boulevard. The Los Angeles Auto Speedway occupied the area south of Wilshire and West of Beverly Drive,and a long groveof eucalyptus ran along the approximate route
http://www.beverlyhills.org/cbhfiles/storage/files/5439787091543355201/HistoricResourcesSurveyReport(2004).pdf
Beverly Hills In Focus - September 2008

in early September – including one in Beverly Hills on Sept. 6 – to discuss two route alternatives. For Beverly Hills residents, an expanded Wilshire Boulevard subway system from downtown Los Angeles to the Westside could spell traffic relief
http://www.beverlyhills.org/cbhfiles/storage/files/filebank/4138--InFocus_Sept08_FINAL_for_WEB.pdf
Demolition Requirements

or contractor shall obtain a Heavy Hauling Permit from the Public Works Department. The permit shall specify hauling routes and other traffic related conditions as deemed necessary.  Grading permit is required when any excavation exceeds two (2) feet
http://www.beverlyhills.org/cbhfiles/storage/files/333056625440296544/demolitionhandout.pdf
BHPD Monthly Report - September 2013

LOCAL AND REGIONAL MULTI-DEPT DISASTER EXERCISES 0% ON TARGET FOR COMPLETION BY END OF FY PROCESS WILL COMMENCE IN THE COMING MONTHS DEVELOP & EDUCATE RESIDENTS ON A CITYWIDE EVACUATION ROUTES 0% ON TARGET FOR COMPLETION BY END OF FY PROCESS
http://www.beverlyhills.org/cbhfiles/storage/files/10637874631997411262/2013-09MonthlyReport.pdf
Monthly Report February 2014

EXERCISES WITH BHFD. DEVELOP & EDUCATE RESIDENTS ON A CITYWIDE EVACUATION ROUTES 20% ON TARGET FOR COMPLETION BY END OF FY CURRENTLY IN STRATEGIC INTER-DEPARTMENTAL COMMUNICATION DEVELOPING EDUCATION AND OUTREACH PLAN. DEVELOP PLAN FOR CNT TO WORK
http://www.beverlyhills.org/cbhfiles/storage/files/1729616336165347090/2014-02MonthlyReport.pdf
Monthly Report January 2014

DISASTER EXERCISES 40% ON TARGET FOR COMPLETION BY END OF FY EARLY PLANNING STAGES AND COMMUNICATION WITH BHFD. DEVELOP & EDUCATE RESIDENTS ON A CITYWIDE EVACUATION ROUTES 10% ON TARGET FOR COMPLETION BY END OF FY CURRENTLY IN STRATEGIC
http://www.beverlyhills.org/cbhfiles/storage/files/1466820374448474023/2014-01MonthlyReport.pdf
BHPD Monthly Report October 2013

EVACUATION ROUTES 0% ON TARGET FOR COMPLETION BY END OF FY PROCESS WILL COMMENCE IN THE COMING MONTHS DEVELOP PLAN FOR CNT TO WORK COLLABORATIVELY WITH ESB 100% ON TARGET FOR COMPLETION BY END OF FY THE CNT HAS BEEN FULLY INTEGRATED WITHIN ESB. IT CONSISTS
http://www.beverlyhills.org/cbhfiles/storage/files/964672516799599477/2013-10MonthlyReport.pdf
<<   1 ...   18   19   20   21   22   ... 33   >>