62°F

Font Size

Questions (Ask Bev)

Video on Demand

Jobs

iMap (GIS)

eNotice

Water Tracker

Org Chart

Advocate Registration
Search Website
Search
CAFR 2009

CITY of BEVERLY HILLS STATE of CALIFORNIA COMPREHENSIVE ANNUAL FINANCIAL REPORT Year Ended June 30, 2009 Prepared by the Staff of the Administrative Services Department Under the Direction of Scott G. Miller, PhD, Director of Administrative
http://www.beverlyhills.org/cbhfiles/storage/files/filebank/6392--CAFR 2009.pdf
2007-08 3rd Quarter Status Report

City of Beverly Hills FY 2007/08 Budget Status Report: 3rd Quarter Summary of Accomplishments Honorable Mayor, City Council and Citizens of Beverly Hills: It is my pleasure to submit to you the third-quarter report for the current Fiscal Y
http://www.beverlyhills.org/cbhfiles/storage/files/filebank/3616--FY07-08_3rd_Quarter_Budget_Status.pdf
C1056 AUR La Cienega - Specs (Amd 5)

of Beverly Hills (COBH) to newly constructed system and hand over to COBH. 4. Duct Route, including associated manholes and vaults for Southern California Edison (SCE). Installation of cabling and splicing in the duct route will be performed by SCE.
http://www.beverlyhills.org/cbhfiles/storage/files/130603030161917600/C1056AURLaCienega-Specs(Amd5).pdf
Appendix A- Beverly Hills Municipal Code

or “taxicab” displayed on the exterior of the vehicle, and is used for the transportation of passengers for hire within and without the boundaries of the city, for which a fee is charged and that does not operate over a defined route. TAXIMETER:
http://www.beverlyhills.org/cbhfiles/storage/files/16522104571279552103/BHMC52814Draft.pdf
CAFR 2003

CCCiiitttyyy ooofff BBBeeevvveeerrrlllyyy HHHiiillllllsss,,, CCCaaallliiifffooorrrnnniiiaaa CCCooommmppprrreeehhheeennnsssiiivvveee AAAnnnnnnuuuaaalll FFFiiinnnaaannnccciiiaaalll RRReeepppooorrrttt YYYeeeaaarrr EEEnnnddde
http://www.beverlyhills.org/cbhfiles/storage/files/filebank/2512--BeverlyHills2003CAFR.pdf
CAFR 2010

CITY of BEVERLY HILLS STATE of CALIFORNIA COMPREHENSIVE ANNUAL FINANCIAL REPORT Year Ended June 30, 2010 Prepared by the Staff of the Administrative Services Department Under the Direction of Scott G. Miller, PhD, Director of Administrative
http://www.beverlyhills.org/cbhfiles/storage/files/filebank/8298--CAFR 2010.pdf
September 2013

ONE WINDOW. FREDERICK AND ANDREA DEMANN (310) 488-4994 AVANCA WOODWORK INC (661) 724-0719 Owner: Contractor: Description : REMODEL KTICHEN AND 2 BATHS. T Kornguth (310) 435-2484 ARTESIAN BUILDERS (951) 809-8177 Owner: Contractor: OBC
http://www.beverlyhills.org/cbhfiles/storage/files/1116955111792427292/imrap.pdf
IFB C1056 Appendix C (Amd 3) - COBH Tech Spec for DI Pipe

piping. Unless otherwise specified, ductile-iron flanged fittings shall be integrally cast in accordance with AWWA C110, rated at a working pressure of 1, 724 KPa (250 psi). Gray-iron or cast-iron flanged fittings are not permitted. The exterior
http://www.beverlyhills.org/cbhfiles/storage/files/485089981442284360/C1056-LaCienega-AppendixC(Amd3)-COBHTechSpecforDIPipe.pdf
CALGreen (GC-1) Residential Checklist Table A4.602

A4.407.1 Install foundation and landscape drains. A4.407.2 Install gutter and downspout systems to route water at least 5 feet away from the foundation or connect to landscape drains which discharge to a dry well, sump, bioswale, rainwater
http://www.beverlyhills.org/cbhfiles/storage/files/filebank/8533--GC-1 Residential CALGreen checklist.pdf
Attachment I : Section 5- Scope of Work

if available. D. Photographs of previously completed A/V equipment racks showing, in detail, cable routing and dressing. E. Sample Quality Assurance Program (QAP) and/or Factory Acceptance Test procedure (FAT) used on jobs of similar size and scope. F.
http://www.beverlyhills.org/cbhfiles/storage/files/10479625151551416730/SECTION5-SCOPEOFWORK.pdf
<<   1 ...   22   23   24   25   26   ... 33   >>