68°F

Font Size

Questions (Ask Bev)

Video on Demand

Jobs

iMap (GIS)

eNotice

Water Tracker

Org Chart

Advocate Registration
Search Website
Search
BHPD Monthly Report July 2013

BY END OF FY CONDUCTED FEASIBILITY AND COST ANALYSIS. Page 3 of 4 SIGNIFICANT EVENTS At approximately 1 PM a patrol unit was dispatched to the 8600 block of Wilshire Blvd for a suspicious substance. The responding officer located an unknown flamable
http://www.beverlyhills.org/cbhfiles/storage/files/939176816885060008/2013-07MonthlyReport(Revised2013-08-19).pdf
BHPD Monthly Report - September 2013

STUDY OF VIABLE OPTIONS FOR PROCESSING DNA EVIDENCE 30% ON TARGET FOR COMPLETION BY END OF FY CONDUCTED FEASIBILITY AND COST ANALYSIS. Page 3 of 4 SIGNIFICANT EVENTS Officers received a call of a Robbery which occurred in the 200 block of N. Crescent
http://www.beverlyhills.org/cbhfiles/storage/files/10637874631997411262/2013-09MonthlyReport.pdf
Monthly Report February 2014

TO INFORMATION TECHNOLOGY AND FINANCE ON THIS WORK PLAN AS REQUESTED AND AS NECESSARY Page 3 of 4 SIGNIFICANT EVENTS At approximately 12 PM, officers observed a suspicious person pushing a covered shopping cart in the area of Alden Dr. and Foothill Blvd.
http://www.beverlyhills.org/cbhfiles/storage/files/1729616336165347090/2014-02MonthlyReport.pdf
BHPD Monthly Report October 2013

STUDY OF VIABLE OPTIONS FOR PROCESSING DNA EVIDENCE 40% ON TARGET FOR COMPLETION BY END OF FY CONDUCTING TURN-AROUND TIME STUDY USING EACH POTENTIAL PRIVATE LAB FOR LIMITED DNA SAMPLE ANALYSIS. Page 3 of 5 SIGNIFICANT EVENTS At approximately 6PM
http://www.beverlyhills.org/cbhfiles/storage/files/964672516799599477/2013-10MonthlyReport.pdf
Monthly Report November 2013

OF VIABLE OPTIONS FOR PROCESSING DNA EVIDENCE 40% ON TARGET FOR COMPLETION BY END OF FY CONDUCTING TURN-AROUND TIME STUDY USING EACH POTENTIAL PRIVATE LAB FOR LIMITED DNA SAMPLE ANALYSIS. Page 3 of 5 SIGNIFICANT EVENTS At approximately 12:50 PM units
http://www.beverlyhills.org/cbhfiles/storage/files/1206274971122691441/2013-11MonthlyReport.pdf
Monthly Report December 2013

50% ON TARGET FOR COMPLETION BY END OF FY STUDY HAS BEEN COMPLETED. STAFF IS CURRENTLY ANALYZING RESULTS. Page 3 of 4 SIGNIFICANT EVENTS At approximately 8:20 PM officers heard an LAPD broadcast of a Robbery. A short time later officers located
http://www.beverlyhills.org/cbhfiles/storage/files/2591703711077771740/2013-12MonthlyReport.pdf
RFP Document

that they are familiar with the relevant provisions of the BHMC and the requirements of the Draft Taxicab Rules and will comply the code and rules as they may be amended. B. PROPOSAL SUBMITTAL Preliminary Schedule Event Date RFP release May 28, 2014
http://www.beverlyhills.org/cbhfiles/storage/files/1967224105935247127/BHTaxicabFranchiseRFP52814.pdf
RFP Document

factors, and overall costs. b. Prepare a Technical Memorandum reviewing alternatives and recommending the optimal transmission pipeline route. c. Review draft with Owner and revise as required. Task 7.2 Establish Design Parameters After City has selected
http://www.beverlyhills.org/cbhfiles/storage/files/1232617161541721098/CityofBeverlyHills-WellPDRRFP_FINAL_combined.pdf
C1056 AUR La Cienega - Specs (Amd 5)

of Beverly Hills (COBH) to newly constructed system and hand over to COBH. 4. Duct Route, including associated manholes and vaults for Southern California Edison (SCE). Installation of cabling and splicing in the duct route will be performed by SCE.
http://www.beverlyhills.org/cbhfiles/storage/files/130603030161917600/C1056AURLaCienega-Specs(Amd5).pdf
Specifications- Irrigation

of Landscape Architect. In the event this notification is not performed, Contractor shall assume full responsibility for any revision necessary. E. Reference Specifications and Standards. 1. ASTM: D1784 Rigid Polyvinyl Chloride (PVC) Compounds
http://www.beverlyhills.org/cbhfiles/storage/files/9969727391891359900/328400-Irrigation.pdf
<<   1 ...   29   30   31   32   33   ... 151   >>