67°F

Font Size

Questions (Ask Bev)

Video on Demand

Jobs

iMap (GIS)

eNotice

Water Tracker

Org Chart

Advocate Registration
Search Website
Search
1-10-13 PC Minutes

the construction of a new three-story commercial building on the property located at 207 South Robertson Boulevard. (Associate Planner Shena Rojemann) Audio recordings of the Planning Commission’s meetings are available online within three days of the meeting.
http://www.beverlyhills.org/cbhfiles/storage/files/11289576341753525839/Minutes-SIGNED.pdf
City Council Accepts Roxbury Park Bids; Construction to Start Next Week

ongoing updates on construction impacts. Roxbury classes have been relocated to other City facilities. Other than the main building, the entire park, including the preschool, will be open during construction. The current Roxbury facilities
http://www.beverlyhills.org/cbhfiles/storage/files/15451771621048832368/RoxburyBidsAcceptedReleaseFINAL.pdf
517 Canon Dr., N.

dominated residential building in Southern California prior to 1915. Its broadly pitched gable roof faces front and side and forms a deep over hang above the shingled exterior walls.. Vines hide the braces and rafters which are probably exposed beneath
http://www.beverlyhills.org/cbhfiles/storage/files/8997052131868265724/517N.CanonDr..PDF
Third Street Proposal Meeting Notice

boutique hotel would be 45 feet in height, plus rooftop amenities. An existing building on the site has housed Lakeshore Entertainment as a City tenant since 2005. The Lakeshore lease has several years remaining and includes an option to renew.
http://www.beverlyhills.org/cbhfiles/storage/files/1540848565508692453/AubergeNotice.pdf
206 Beverly Dr., N.

and store buildIng designed originally In a I~Ioorish style but radically altered now. ~ nct~ facade has oblit erated the series of two story arches along Beverly Drive and substi tuted a ser~os of vertical stripes and meshwork, slats and a large neon
http://www.beverlyhills.org/cbhfiles/storage/files/986825552926963809/206N.BeverlyDr.(BeverlyTheater).PDF
Trousdale Notification of Hauling Form

Date Submitted: Assigned Project Building Inspector: ***This information needs to be submitted in its entirety
http://www.beverlyhills.org/cbhfiles/storage/files/7871829801325753070/24HOURNOTIFICATION.pdf
City of Beverly Hills to Present Architectural Design Awards

(301 N. Rodeo Drive)  Rodeo Drive Large Retail – Louis Vuitton (295 N. Rodeo Drive) The Architectural Design Awards are presented to designers and architects for recently completed building renovations or new projects reviewed
http://www.beverlyhills.org/cbhfiles/storage/files/1655157714115899836/ArchDesignAwards2015.pdf
2015 Special Olympics Final Leg Ceremony

towns and communities across the state to host the Flame of Hope as it is carried from the State Capitol building in Sacramento to the Los Angeles Memorial Coliseum for the Opening Ceremony of the 2015 Special Olympics World Games. The Law Enforcement
http://www.beverlyhills.org/cbhfiles/storage/files/117590546873305779/SpecialOlympicsTorchRun2015.pdf
4-01-16 City Council Liaison / Planning Commission Committee Highlights

the opportunity to directly address the Committee on any item listed on the agenda. Speakers: None 2) 370 NORTH RODEO DRIVE – DEVELOPMENT OF NEW CARTIER RETAIL BUILDING The applicant team, led by representative Murray Fischer and architect
http://www.beverlyhills.org/cbhfiles/storage/files/766508102742686598/4-01-16PC-CouncilLiaisonHighlights.pdf
Main Document

or provide the material or services; (4) Whether the bidder can perform the Contract or provide the service promptly, or within the time specified, without delay or interference; (5) The sufficiency of the bidder's financial resources
http://www.beverlyhills.org/cbhfiles/storage/files/77597356874161729/B13-01-main.pdf
<<   1 ...   164   165   166   167   168   ... 278   >>