66°F

Font Size

Questions (Ask Bev)

Video on Demand

Jobs

iMap (GIS)

eNotice

Water Tracker

Org Chart

Advocate Registration
Search Website
Search
4-18-12 AC Minutes

of the building — it feels borrowed from another building. The kick plate and hand rails should be finished similarly to the door and canopy. There are too many variations of materials throughout the façade. Its needs a more cohesive appearance. Consider
http://www.beverlyhills.org/cbhfiles/storage/files/6627993091068968226/4-18-12ACMinutes.pdf
8-15-12 AC Minutes

> The proposed façade remodel needs to be considerate of the architecture of the building. The Integrity of the building should not be compromised. Taking away half the columns doesn’t work. > Provide additional information for the proposed bench. Page 7 of 10
http://www.beverlyhills.org/cbhfiles/storage/files/1643249542697270677/8-15-2012ACMinutes.pdf
Specifications

to be tested/inspected. c. To facilitate tests/inspections. d. To provide storage and curing of test samples. 4. Notify Design Professional and laboratory 24 hours prior to expected time for operations requiring testing/inspection services. 5. Employ services
http://www.beverlyhills.org/cbhfiles/storage/files/13034077851680021995/Specifications.pdf
Hawthorne Afterschool Classes

challenging robot models of dinosaurs. Building these one of a kind dino-robots will introduce students to the fundamentals of robotics. As kids use infra-red remote controls, transmission gears and other electronic tools, they will develop thinking
http://www.beverlyhills.org/cbhfiles/storage/files/8225142181705076675/Fall2014_HawFORWEB.pdf
FY 2008-09 CIP Budget

................................................................................. 131 CIP 0713: Repaint City Buildings .................................................................................................. 132 CIP 8502: Vehicle/Equipment Replacement Program
http://www.beverlyhills.org/cbhfiles/storage/files/filebank/3748--CIP Document - Volume 2.pdf
Form 460, Preelection Statement & Amendment 07/01/2012 - 12/31/2012

building and web hosting #24-42BartonAvenue WEB $1,700.00 Toronto, Ontario M6GIP3, Canaga Method Campaign Services Campaign consulting and co-ordination 4657 West 1st Street CNS VanSmart $2,000.00 Los Angeles, CA 90004 ~ Payments that are contributions
http://www.beverlyhills.org/cbhfiles/storage/files/280325074691331347/NancyKrasne-Form460PreelectionStatementAmendment07-01-2012thru12-31-2012.pdf
12-14-11 AC Minutes

The Commission discussed the warehouse building. ACTION: There was no action taken on this item. COMMUNICATIONS FROM THE ARCHITECTURAL COMMISSION • Meeting Recap Discussion No action taken on this item,. COMMUNICATIONS FROM THE DIRECTOR OF COMMUNITY
http://www.beverlyhills.org/cbhfiles/storage/files/filebank/10117--12-14-11 Minutes (Signed).pdf
Specifications

services. D. Section 01340 – Submittal Schedule. 1.03 REFERENCES A. ASTM C 1021 - Standard Practice for Laboratories Engaged in Testing of Building Sealants; 2001. B. ASTM C 1077 - Standard Practice for Laboratories Testing Concrete and Concrete
http://www.beverlyhills.org/cbhfiles/storage/files/1881952725325208288/Specifications.pdf
Plan Review & Permit Application

CITY OF BEVERLY HILLS Plan Review / Permit Application   FOR CUSTOMER  USE   BUILDING / SHORING  ELECTRICAL  MECHANICAL  PLUMBING  SOLAR PANEL  FIRE SPRINKLER  FIRE ALARM  POOL/SPA  CERTIFICATE OF COMPLETION  CERTIFICATE
http://www.beverlyhills.org/cbhfiles/storage/files/filebank/9156--Plan Review-Permit Application.pdf
121 Beverly Dr., S.

As the City grew in the 1930s and 40s, the business section of the commercial tri angle was no longer adequate. More buildings along the Wilshire corridor were con structed, and certain streets, primarily Beverly Drive, began to have commercial uses south
http://www.beverlyhills.org/cbhfiles/storage/files/1566312939384921438/121S.BeverlyDr..PDF
<<   1 ...   76   77   78   79   80   ... 204   >>