70°F

Font Size

Questions (Ask Bev)

Video on Demand

Jobs

iMap (GIS)

eNotice

Water Tracker

Org Chart

Advocate Registration
Search Website
Search
3-21-12 AC Minutes

of the building. Addition information should be provided for the signs (i.e. connection details, sign sections, material examples, dimensions of signs, colors of materials.) > Providing a model of the building would be helpful to understand mass. > Provide
http://www.beverlyhills.org/cbhfiles/storage/files/91906100218947736/3-21-2012ACMinutes.pdf
4-18-12 AC Minutes

of the building — it feels borrowed from another building. The kick plate and hand rails should be finished similarly to the door and canopy. There are too many variations of materials throughout the façade. Its needs a more cohesive appearance. Consider
http://www.beverlyhills.org/cbhfiles/storage/files/6627993091068968226/4-18-12ACMinutes.pdf
Specifications

to be tested/inspected. c. To facilitate tests/inspections. d. To provide storage and curing of test samples. 4. Notify Design Professional and laboratory 24 hours prior to expected time for operations requiring testing/inspection services. 5. Employ services
http://www.beverlyhills.org/cbhfiles/storage/files/13034077851680021995/Specifications.pdf
8-15-12 AC Minutes

> The proposed façade remodel needs to be considerate of the architecture of the building. The Integrity of the building should not be compromised. Taking away half the columns doesn’t work. > Provide additional information for the proposed bench. Page 7 of 10
http://www.beverlyhills.org/cbhfiles/storage/files/1643249542697270677/8-15-2012ACMinutes.pdf
Hawthorne Afterschool Classes

challenging robot models of dinosaurs. Building these one of a kind dino-robots will introduce students to the fundamentals of robotics. As kids use infra-red remote controls, transmission gears and other electronic tools, they will develop thinking
http://www.beverlyhills.org/cbhfiles/storage/files/8225142181705076675/Fall2014_HawFORWEB.pdf
FY 2008-09 CIP Budget

................................................................................. 131 CIP 0713: Repaint City Buildings .................................................................................................. 132 CIP 8502: Vehicle/Equipment Replacement Program
http://www.beverlyhills.org/cbhfiles/storage/files/filebank/3748--CIP Document - Volume 2.pdf
12-14-11 AC Minutes

The Commission discussed the warehouse building. ACTION: There was no action taken on this item. COMMUNICATIONS FROM THE ARCHITECTURAL COMMISSION • Meeting Recap Discussion No action taken on this item,. COMMUNICATIONS FROM THE DIRECTOR OF COMMUNITY
http://www.beverlyhills.org/cbhfiles/storage/files/filebank/10117--12-14-11 Minutes (Signed).pdf
Specifications

services. D. Section 01340 – Submittal Schedule. 1.03 REFERENCES A. ASTM C 1021 - Standard Practice for Laboratories Engaged in Testing of Building Sealants; 2001. B. ASTM C 1077 - Standard Practice for Laboratories Testing Concrete and Concrete
http://www.beverlyhills.org/cbhfiles/storage/files/1881952725325208288/Specifications.pdf
2008-09 1st Quarter Status Report - Volume II

CAPITAL IMPROVEMENT PROJECTS CIP Number 0856311 SYSTEM 0888331 FOOTHILL RD OFFICE BUILDING 0881336 FOOTHILL RD 0897455 N CRESCENT PARKING STUDY AND GARAGE 08929268 THIRD ST 08989400 SANTA MONICA BLVD STUDY AND DEVELOPMENT 0895AUTOVU
http://www.beverlyhills.org/cbhfiles/storage/files/filebank/4662--FY 08-09 1st Quarter CIP Final.pdf
RFP Document

identified on the consolidated contingency plan a) NRC would be notified if there was a release of over 1,000 pounds, or 78 gallons of ammonium hydroxide. b) The facility would notify the administering agency and the state office of emergency services
http://www.beverlyhills.org/cbhfiles/storage/files/254280373316292048/RFP-RiskManagementPlan(RMP)fortheHandlingandStorageofAmmoniaHydroxide.pdf
<<   1 ...   77   78   79   80   81   ... 201   >>