65°F

Font Size

Questions (Ask Bev)

Video on Demand

Jobs

iMap (GIS)

eNotice

Water Tracker

Org Chart

Advocate Registration
Search Website
Search
Electric Vehicle Charging Station

Development Department - Building and Safety division should be consulted to determine specific requirements. If a contractor is hired to perform the work, it is the homeowner’s responsibility to ensure that the appropriate electrical permits have been
http://www.beverlyhills.org/business/constructionlanduse/commercialbuildings/electricvehiclecharging
Harry Cohn Estate Historic Assessment Report

 at Charles E. Young  Research Library, Department of Special Collections, UCLA), City of Beverly Hills  building permits,  Sanborn Fire  Insurance maps, tax assessor records, historic photographs, and newspaper articles. This  research enabled documentation
http://www.beverlyhills.org/cbhfiles/storage/files/4247609921405870050/ARG1000N.Crescentrevsiedreport2-10-14_combined.pdf
9900 Wilshire Boulevard Final EIR

Effects; Geologic/Seismic; Growth Inducing; Landuse; Noise; Population/Housing Balance; Public Services; Recreation/Parks; Schools/Universities; Sewer Capacity; Soil Erosion/Compaction/GradIng; Solid Waste; Toxic/Hazardous; Traffic/Circulation; Water
http://www.beverlyhills.org/cbhfiles/storage/files/8861534601733779175/CombinedFinalEIR.pdf
Planning Commission Meeting Synopsis 10-16-2008

for a Modification to a Conditional Use Permit allowing Medical and Retail Uses at a 13-Unit Commercial Condominium Building Yukelson/Cole - 4 To approve a modification to a Conditional Use Permit to allow medical and retail uses at a 13-unit commercial
http://www.beverlyhills.org/cbhfiles/storage/files/filebank/4285--SYNOPSIS 10-16-08.pdf
3-21-12 AC Minutes

of the building. Addition information should be provided for the signs (i.e. connection details, sign sections, material examples, dimensions of signs, colors of materials.) > Providing a model of the building would be helpful to understand mass. > Provide
http://www.beverlyhills.org/cbhfiles/storage/files/91906100218947736/3-21-2012ACMinutes.pdf
4-18-12 AC Minutes

of the building — it feels borrowed from another building. The kick plate and hand rails should be finished similarly to the door and canopy. There are too many variations of materials throughout the façade. Its needs a more cohesive appearance. Consider
http://www.beverlyhills.org/cbhfiles/storage/files/6627993091068968226/4-18-12ACMinutes.pdf
Specifications

to be tested/inspected. c. To facilitate tests/inspections. d. To provide storage and curing of test samples. 4. Notify Design Professional and laboratory 24 hours prior to expected time for operations requiring testing/inspection services. 5. Employ services
http://www.beverlyhills.org/cbhfiles/storage/files/13034077851680021995/Specifications.pdf
FY 2008-09 CIP Budget

................................................................................. 131 CIP 0713: Repaint City Buildings .................................................................................................. 132 CIP 8502: Vehicle/Equipment Replacement Program
http://www.beverlyhills.org/cbhfiles/storage/files/filebank/3748--CIP Document - Volume 2.pdf
Hawthorne Afterschool Classes

challenging robot models of dinosaurs. Building these one of a kind dino-robots will introduce students to the fundamentals of robotics. As kids use infra-red remote controls, transmission gears and other electronic tools, they will develop thinking
http://www.beverlyhills.org/cbhfiles/storage/files/8225142181705076675/Fall2014_HawFORWEB.pdf
8-15-12 AC Minutes

> The proposed façade remodel needs to be considerate of the architecture of the building. The Integrity of the building should not be compromised. Taking away half the columns doesn’t work. > Provide additional information for the proposed bench. Page 7 of 10
http://www.beverlyhills.org/cbhfiles/storage/files/1643249542697270677/8-15-2012ACMinutes.pdf
<<   1 ...   77   78   79   80   81   ... 202   >>