85°F

Font Size

Questions (Ask Bev)

Video on Demand

Jobs

iMap (GIS)

eNotice

Water Tracker

Org Chart

Advocate Registration
Search Website
Search
Applicant Guide

For assistance and additional information on the Beverly Hills Electronic Review please contact us. Email buildingandsafetyinfo@beverlyhills.org Phone Ron Otamura, Office Building Inspector (310) 285-1159 Ruth Perez, Customer Service
http://www.beverlyhills.org/cbhfiles/storage/files/4765307811519293187/ePlanUserGuideFinal.pdf
Sewer System Master Plan Report (Part 2)

Hydraulic Model Project Manager Farzad Dorrani M.S. (Advanced Infrastructure Management, Inc.) Hydraulic Modeler Noah Walker (3-Waters Technical Services) September 2010 CITY OF BEVERLY HILLS Sewer Master Plan Page
http://www.beverlyhills.org/cbhfiles/storage/files/1780375632231514391/SSMPReportPart2.pdf
Exponent Report on Metro's Safety and Seismic Findings

an abandoned oil well was encountered that was not on record with the State Department of Oil & Gas and Geothermal Services (DOGGR) and was undetected before excavation began, since the oil well was cut-off below the surface (Keller and Crow, 2004).
http://www.beverlyhills.org/cbhfiles/storage/files/filebank/10153--Report - Assessment of Westside Subway Extension_Final.pdf
Specifications- Irrigation

with Contract Documents. B. Summary of Work: Contractor shall furnish all labor, materials, equipment, and services necessary to install the irrigation system as indicated on the approved drawings and specified herein and shall perform all other incidental
http://www.beverlyhills.org/cbhfiles/storage/files/9969727391891359900/328400-Irrigation.pdf
Addendum No. 1

1 – GENERAL 1.1 SUMMARY A. General: This Section includes the Irrigation System in accordance with Contract Documents. B. Summary of Work: Contractor shall furnish all labor, materials, equipment, and services necessary to install the irrigation
http://www.beverlyhills.org/cbhfiles/storage/files/5326832911327907882/AddendumNo1.pdf
Commercial Accessibility Plan Review Checklist

7 301-400 8 401- 500 9 501-1000 2% of total 1001 & over 20 plus one for each 100 or fraction thereof over 1,001 3. At facilities providing medical care and other services for persons with mobility impairments, parking spaces City of Beverly
http://www.beverlyhills.org/cbhfiles/storage/files/filebank/5164--2008 BH Plan Review List - Commercial Accessibility v1.pdf
10-19-11 Synopsis

packet is available for review in the Library and Planning Department. In accordance with the Americans with Disabilities Act, if you need special assistance to participate in this meeting, please call the Planning Department at 310-285-1141.
http://www.beverlyhills.org/cbhfiles/storage/files/filebank/9672--10-19-2011 SY Final.pdf
918 Alpine Dr., N.

and library areas on the first floor, and from which the bedroom suites flowed on the second. Panelled throughout, the main rooms had coffered ceilings and luxurious furnishings. As the premier example of Kellyts work in Beverly Hills, the 0. B. English
http://www.beverlyhills.org/cbhfiles/storage/files/6477908451237422337/918N.AlpineDr..PDF
Mayor's Cabinet Meeting Highlights - Monday, March 3, 2014

building will move to spot near the Library. The commission continues to discuss the best way to protect the Kusama sculpture. The restoration of the City’s public art continues. The commission was asked to look at the possibility of purchasing
http://www.beverlyhills.org/cbhfiles/storage/files/714698974672968335/MayorsCabinetMeetingNotesMar3-2014.pdf
04-09-08 Synopsis

A detailed Commission packet is available for review in the Library and Planning Department. In accordance with the Americans with Disabilities Act, if you need special assistance to participate in this meeting, please call
http://www.beverlyhills.org/cbhfiles/storage/files/filebank/3181--AC 4 09 08 SY.pdf
<<   1 ...   174   175   176   177   178   ... 180   >>