Clifton-Le Doux Corridor Mobility Study
Project overview

The City of Beverly Hills is studying ways to reduce speeding and cut-through traffic to create a safer and more comfortable street for residents—especially those who walk or cycle.

 

Clifton-Le Doux Project Area

 

On Saturday, March 25, 2023, the City placed temporary traffic calming devices at the intersections of Clifton/Le Doux and Clifton/Stanley for the community to experience and provide feedback to the City. Below are conceptual designs of the temporary traffic calming devices, which included a traffic circle and curb extensions.

As a follow-up to the event, the City hosted an online survey in April/May 2023 regarding your experiences using the temporary devices and thoughts regarding longer-term installations. Staff presented preliminary survey results at the June 1, 2023 Traffic and Parking Commission meeting (view the staff report here). Final survey results indicated continued support for the project, including a 6-month demonstration of traffic calming devices on Clifton Way between Robertson and La Cienega Boulevards.

At the October 5, 2023, Traffic and Parking Commission meeting, staff presented conceptual design for the potential 6-month demonstration, which could begin as early as winter 2024. The Commission unanimously recommended that City Council install the temporary project. To view the meeting recording, click here. To view the staff report, click here.

The next step is for City Council to consider approval of installation of the 6-month demonstration. To obtain community feedback, the City invites the community to participate in the upcoming City Council Study Session meeting:

WHAT: City Council review of conceptual design for a potential 6-month demonstration of traffic calming on Clifton Way between Robertson and La Cienega Boulevards

WHEN: December 5, 2023 at 3:30 PM (or as soon thereafter as the item may be heard)

WHERE: Council Chamber or beverlyhills.org/live

The staff report with more details about proposed conceptual design and how to participate in the meeting will be available by December 2, 2023 at: beverlyhills.org/CityCouncilMeetings

For questions please email AskPW@beverlyhills.org or call (310) 285-2467.

Clifton/Le Doux: temporary traffic circleClifton-Le Doux Traffic Circle

Traffic Circle 1

Traffic Circle 2

Clifton/Stanley: temporary curb extensionsClifton-Stanley Curb Extensions

Curb Extensions 1

Curb Extensions 2

   

  • City of Beverly Hills Shield
  • City of Beverly Hills
  • 455 North Rexford Dr
    Beverly Hills, CA 90210
  •  
  • (310) 285-1000
  • Monday-Thursday 7:30AM-5:30PM
  • Friday 8:00AM-5:00PM

© Copyright 2023, City of Beverly Hills. All Rights Reserved.