81°F

Font Size

Questions (Ask Bev)

Video on Demand

Jobs

iMap (GIS)

eNotice

Water Tracker

Org Chart

Advocate Registration
Search Website
Search
Bid Package

a) 2009 Kubota L5040GST Utility Tractor Hourmeter reading at time of bid: 400 hours 52 HP Kubota Diesel engine 4-wheel drive Glide-shift transmission Wet-disc brakes Category II 3-point hitch Power steering 2-post foldable ROPS
http://www.beverlyhills.org/cbhfiles/storage/files/5596260331641596531/Bid13-10_TractorArticulatedSteeringCompactWheelLoader.pdf
Harry Cohn Estate Historic Assessment Report

’s room and a bathroom on the first floor and  remodeling/addition of bedrooms, bathrooms, and a study on the second floor. Exterior alterations  included the one‐story addition of a  living room and loggia on the rear of the house’s north side
http://www.beverlyhills.org/cbhfiles/storage/files/4247609921405870050/ARG1000N.Crescentrevsiedreport2-10-14_combined.pdf
October 2013

N $3,293.19 $3,293.19 $0.00 Description : REINFORCE ROOF FRAMING AND ADD SHEAR WALLS RAISE CEILING HT IN LIVING ROOM - REPLACE SUDERS. CARLO & SONIA DOLLERO (310) 278-8154 BONURA C J BUILDING (323) 478-0101 Owner: Contractor: Description : Shoring
http://www.beverlyhills.org/cbhfiles/storage/files/290360286793993694/imrap.pdf
Bid Documents

shall be modified and reinforced with a welded steel framework. The rear window openings on each side of the module access shall be covered with 14 ga. steel and painted to match the body. 2 MODULAR CONSTRUCTION All material utilized
http://www.beverlyhills.org/cbhfiles/storage/files/4229949761563551655/biddoc12-31.pdf
9900 Wilshire Blvd Draft EIR

....................................................................4.11�1� 4.12� Utilities�and�Service�Systems .......................................................................................................4.12�1� 4.12.1� Water
http://www.beverlyhills.org/cbhfiles/storage/files/1448187562158216332/CombinedDraftEIR.pdf
Exponent Report on Metro's Safety and Seismic Findings

recommended. This effort should be coordinated with utility organizations to determine if any sensitive supply lines exist that should be repaired or replaced before tunneling commences in that area. Other utilities, such as storm drain systems, may
http://www.beverlyhills.org/cbhfiles/storage/files/filebank/10153--Report - Assessment of Westside Subway Extension_Final.pdf
TAB 2 - Tory Burch

Commission at a later date. The project preview occurred on September 19, 2012, and the Architectural Commission unanimously supported the proposed design. Specifically, the Commission felt that the project utilizes high quality design and materials,
http://www.beverlyhills.org/cbhfiles/storage/files/503711412342292992/TAB2-ToryBurch.pdf
Gateway FEIR Volume 2

& Hazardous Materials Hydrology/Water Quality Land Use/Planning Mineral Resources Noise Population/Housing Public Services Recreation Transportation/Traffic Utilities/Service Systems Mandatory Findings of Significance Initial Study Beverly Hills
http://www.beverlyhills.org/cbhfiles/storage/files/1786631115284172993/GatewayFEIRVol2.pdf
Greystone Venue Brochure

entertainment areas used by a first family of Beverly Hills to host both intimate and grand events. CARD ROOM LIVING ROOM GRAND HALL LIBRARY DINING ROOM BREAKFAST ROOM July 2015 PAGE
http://www.beverlyhills.org/cbhfiles/storage/files/15546085971445326500/GreystoneVenueBrochureJuly2015.pdf
Water Enterprise Plan Report

expenditures. In recognition of the preliminary nature of these estimates, high and low ranges for the projected costs utilizing widely accepted guidelines established by the AACE (formerly known as the Association for the Advancement of Cost Engineering)
http://www.beverlyhills.org/cbhfiles/storage/files/13699920851488612043/FINALPsomasCBHWEPReport_08102015V2.pdf
<<   1 ...   78   79   80   81   82   ... 100   >>