59°F

Font Size

Questions (Ask Bev)

Video on Demand

Jobs

iMap (GIS)

eNotice

Water Tracker

Org Chart

Advocate Registration
Search Website
Search
C1056 Amendment 5 24x36 (CHANGED SET) - 4-30-14

WESTSIDE SUBWAY EXTENSION PROJECT Contract No. PS-4350-2000 LOS ANGELES COUNTY METROPOLITAN TRANSPORTATION AUTHORITY WESTSIDE SUBWAY EXTENSION PROJECT C1056 Advanced Utility Relocations Contract, Section 1 Wilshire/La Cienega Station
http://www.beverlyhills.org/cbhfiles/storage/files/5693745581279224162/2014.04.30.Amendment524x36(CHANGEDSET).pdf
10-17-12 AC Minutes

to the Architectural Commission at its October 17, 2012 meeting, shall be utilized for the construction barricade graphic. No construction barricade graphic shall be located on that portion of the barricade that is perpendicular to North Rodeo Drive. STANDARD
http://www.beverlyhills.org/cbhfiles/storage/files/11803837481450030730/10-17-12Minutes-WEB.pdf
Sample Design Agreement

Insurance covering personal injury and property damage, with minimum limits of One Million Dollars ($1,000,000) per occurrence combined single limit, covering any vehicle utilized by CONSULTANT in performing the Scope of Work required by this Agreement.
http://www.beverlyhills.org/cbhfiles/storage/files/1637751821230516838/Sampledesignagreement01-2013.pdf
Sample Design Agreement

Insurance covering personal injury and property damage, with minimum limits of One Million Dollars ($1,000,000) per occurrence combined single limit, covering any vehicle utilized by CONSULTANT in performing the Scope of Work required by this Agreement.
http://www.beverlyhills.org/cbhfiles/storage/files/1215034551035061056/Sampledesignagreement01-2013.pdf
Gateway FEIR Supplemental Analysis

as development was assumed to be constructed utilizing an FAR varying from 1.5 to 2.0 and a maximum building height of 60 feet. As noted above, figures 2 through 9 were prepared to illustrate the entire potential area within which buildings could be built,
http://www.beverlyhills.org/cbhfiles/storage/files/1633296010566023992/GatewayFEIRSupplmentalAnalysis.pdf
Bid Package

BID NO. 14-03 City of Beverly Hills Rexford Drive Intersection Improvements Project 1 of 25 BID PACKAGE NO. 14-03 CITY OF BEVERLY HILLS PUBLIC WORKS & TRANSPORTATION - PROJECT ADMINISTRATION 345 FOOTHILL ROAD BEVERLY HILLS, CALIFO
http://www.beverlyhills.org/cbhfiles/storage/files/141126655422598312/BidDocuments.pdf
FY 2013 Single Audit Report

ended June 30, 2013, the City disbursed $160,461 to subrecipients, utilizing funds provided by the U.S. Department of Housing and Urban Development Community Development Block Grant. 4. RELATIONSHIP TO COMPREHENSIVE ANNUAL FINANCIAL REPORT:
http://www.beverlyhills.org/cbhfiles/storage/files/6920688671832088056/FY2013SingleAuditReport.pdf
Bid Document

for operation upon delivery. e) Equipment will be utilized by the Department of Public Works & Transportation Water Distribution Maintenance Division in the maintenance of the City’s water-distribution infrastructure. As such, equipment shall be able
http://www.beverlyhills.org/cbhfiles/storage/files/17116905311147535085/Bid14-32_TruckMountedwithValveOperatorandVacuumMachine.pdf
ARMP Presentation

serving California public agencies  Partner based in Los Angeles Office Over 14 years of experience working with cities, counties, special districts and other public agencies  Specializes in bond financing for public infrastructure, utilities
http://www.beverlyhills.org/cbhfiles/storage/files/264386659670376413/ManagingPersonnelCostsPresentationforWebsite4511.pdf
Sample Agreement

Vehicle Liability Insurance covering personal injury and property damage, with minimum limits of One Million Dollars ($1,000,000) per occurrence combined single limit, covering any vehicle utilized by CONTRACTOR in performing the services required
http://www.beverlyhills.org/cbhfiles/storage/files/1241907760639921201/SmapleAgreement.pdf
<<   1 ...   78   79   80   81   82   ... 89   >>